Bill of Materials

Bill of Materials

March 28, 2026
1 min read (8 min read total)
1 subpost

The design posts defined what the cluster needs. This is where requirements become specific hardware — but not all at once. Buy one, test it, then buy the rest.

Note (Market context)

Everything here was sourced from the Polish used/refurbished market, primarily Allegro.pl.

The BOM is split into two stages:

Summary (BOM stages)
  1. Pre-Validation — One node and the full network infrastructure. Chassis, NIC, boot SSD, router, switch, cabling. Enough to prove the design works before committing to three or five nodes.
  2. Post-SNO — Final hardware after OKD Single Node validation. Additional nodes, enterprise NVMe, HDDs, and any swaps based on lessons learned. (coming soon)

Start with the pre-validation BOM to see what was sourced and why.